Close Menu
    Facebook X (Twitter) Instagram
    Trending
    • New Zealand Thrash Australia 43-21 in Bledisloe Cup to Extend Winning Streak
    • Warhammer Age of Sigmar Reveals Three Khazalite Holds Armies of Renown Combining Duardin Forces
    • UK Households Could Face Higher Energy Bills Under Ofgem Plans to Protect Suppliers
    • Shark Nebula Image Wins Royal Observatory Greenwich Astronomy Photography Prize
    • Pre-Orders Open for Camp Snap 110 D Screen-Free Digital Camera
    • Researchers Used Claude to Exploit OpenAI Employee ChatGPT Accounts
    • Sigma Unveils 85mm f/1.2 DG Art as Its Fastest Portrait Lens Yet
    • South Park Creators Rename Show ‘South America’ in Apparent Trump Dig
    Mediarun Search
    • Home
    • Top News
    • World
    • Economy
    • Science
    • Technology
    • Sport
    • Entertainment
    • Contact Us
    Mediarun Search
    Home»Tech»The Rio Niteroi Bridge may not have a toll plaza anymore
    Tech

    The Rio Niteroi Bridge may not have a toll plaza anymore

    Edward LangleyBy Edward LangleyApril 1, 2023No Comments2 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    The Rio Niteroi Bridge may not have a toll plaza anymore
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Involved

    tweet

    Involved

    Involved

    e-mail


    Ecoponte, in partnership with Ecosul and Eco101, franchisees of the EcoRodovias Group, is in the testing phase developing a pilot project for the installation of a multi-lane free flow system, which consists of toll charges without physical yards.

    In this configuration, flow is free and payment is made by reading the license plate, accompanied by a tag affixed to the vehicle. Technology is, in practice, eliminating the toll yard, making traffic more fluid.

    The system started operating on the Rio Santos Expressway, which is operated by CCR Group. Cameras and sensors are installed in the gantry cranes all the way around, to identify the license plate and vehicle model.

    The project, which has been approved by the National Agency for Land Transportation (ANTT), aims to check the operational efficiency of the means of propulsion in the reality of the Rio Niteroi Bridge and to understand whether it will be effective.

    The Research Institute of the Federal University of Rio Grande do Sul, Lastran, is responsible for analyzing and collecting data and the studies will continue until 2024. The process is in the stage of procurement of equipment and software development and expectations are that the tests will begin in May.





    Edward Langley

    Edward Langley is a contributor at Mediarunsearch.co.uk, covering a wide range of topics including news, politics, business, technology, sport, entertainment and lifestyle. He focuses on delivering clear, balanced reporting and useful information that helps readers stay informed about current affairs and developing stories. His work highlights issues, trends and events that matter to everyday audiences, with an emphasis on accuracy, relevance and accessible journalism.

    See also  iPhone 14: Apple announces September 7 launch event | cell
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    Pre-Orders Open for Camp Snap 110 D Screen-Free Digital Camera

    September 19, 2026

    Sigma Unveils 85mm f/1.2 DG Art as Its Fastest Portrait Lens Yet

    September 9, 2026

    ChatGPT Hit by Major Outage as OpenAI Reports Errors and Delays

    September 1, 2026
    Leave A Reply Cancel Reply

    Navigate
    • Home
    • Top News
    • World
    • Economy
    • Science
    • Technology
    • Sport
    • Entertainment
    • Contact Us
    Pages
    • About Us
    • Contact Us
    • DMCA
    • Editorial Policy
    • Privacy Policy
    © 2026 Media Run Search. All Rights Reserved. Designed by Media Run Search.

    Type above and press Enter to search. Press Esc to cancel.